UNITED BULK TERMINAL-ELEVATED DOCK OFFICE SUPPORT STRUCTURE

Industry: Ports & Terminals  |  Service: Structural & Mechanical Engineering Location: United Bulk Terminal, Davant, LA THE CHALLENGE As part of United Bulk Terminal’s expansion program, the upper surge bin on the transfer tower was to be replaced with a new elevated dock office — a 320 sq. ft container (40 ft × 8 ft) […]

OXBOW SULFUR HANDLING FACILITY – HIGH-ANGLE CONVEYOR ENGINEERING

Industry: Chemical / Industrial  |  Service: Conveyor Engineering & Analysis Location: Southampton, UK THE CHALLENGE Oxbow’s sulfur handling facility in Southampton converts liquid sulfur into pastilles using a steel belt system, then transfers the pastilles into a silo for truck loading. The site presented a set of interrelated engineering challenges: The site footprint was too […]

UNITED BULK TERMINAL-TRANSFER MAGNET MONORIAL ENGINEERING

Industry: Ports & Terminals  |  Service: Lift Planning & Rigging Engineering, Structural & Mechanical Engineering Location: United Bulk Terminal, Davant, LA – C1–C2–C6 Transfer Tower THE CHALLENGE As part of the terminal’s expansion to add a parallel C2 conveyor alongside the existing C1, United Bulk Terminal needed magnetic separators installed at the C1–C6 transfer to […]

CARGO PORT HIGH-ANGLE CONVEYOR ENGINEERING FOR FERTILIZER SHIPLOADER

Industry: Ports & Terminals  |  Service: Conveyor Engineering & Analysis THE CHALLENGE A cargo port required a conveyor system to lift 600 t/h of fertilizer material 12.9 meters from the existing dock conveyor to the outgoing shiploader, within a footprint of just 29 meters. Three constraints had to be satisfied simultaneously: maintain the existing dock […]

UNITED BULK TERMINAL-SKY HOPPER SUPPORT STRUCTURE ENGINEERING

Industry: Ports & Terminals  |  Service: Structural & Mechanical Engineering Location: United Bulk Terminal, Davant, LA THE CHALLENGE As part of a terminal expansion at United Bulk Terminal, a new C2 conveyor was to be installed parallel to the existing C1 conveyor on the C1–C2–C6 transfer tower. The new conveyor required the addition of new […]